摘要
万科中粮假日风景项目D地块住宅楼工程结构形式均为装配式剪力墙结构,采用装配整体式结构安装体系。施工中采用了多功能钢梁平衡吊运技术、可调节斜支撑校正技术、墙板套筒灌浆逆向充填操作工艺、机械式承重托座应用技术等多项新技术。为解决新技术在施工应用中的实际问题,成立了预制课题研究小组,对预制结构的加工、运输、吊装、安全围护、各节点施工工艺等进行了研究,充分发挥了工厂批量生产的优势,加快了施工进度、保证了施工质量、降低了工程成本、提高了住宅品质,实现了住宅工业产业化施工。
All residential buildings on plot D of Vanke COFCO Holiday Scene Project are of assembled shear wall structure and adopt integral assembled structure installation system. During construction, many new techniques are adopted, such as multifunctional steel beam balance lifting technique, adjustable inclined supporting correction technique, wall panel coupler grouting converse filling process and application technique of mechanical load bearing bracket, etc. In order to solve the problems in practical application of these new technique in construction, prefabrication subject research group is established to research process, transportation and lifting of prefabricated structure, safety enclosure and node construction process, successfillly taking the advantages of mass production, accelerating the construction schedule, ensuring construction quality, saving engineering construction cost, improving residential quality and realizing industrialized construction of residential building.
出处
《建筑技术》
2013年第1期28-30,共3页
Architecture Technology
关键词
装配式安装体系
钢梁平衡吊运
可调节斜支撑
墙板套筒灌浆
机械式承重托座
assembly installation system
steel beam balance lifting
adjustable inclined support
wall panel coupler grouting
mechanical load bearing bracket