考虑水流滞时的梯级水电日优化调度模型 被引量:7

Daily Optimal Scheduling Model for Cascade Hydropower Stations Considering the Flow Delay Time
原文传递
导出
摘要 提出了考虑水流滞时的短期梯级水电日优化调度模型。将水流滞时表示成平均出库流量的非线性函数形式,以反映梯级水电站间水流滞时的动态特性。同时,提出了针对复杂的水流滞时、水电转换、分段出力限制等非线性函数线性函数线性化建模的新方法,通过引入多组状态变量及相关约束,将梯级水电日优化调度问题转换为线性混合整数规划问题,最后,采用CPLEX商用软件包进行求解。通过对包含13个水库、44台机组的梯级水电系统的算例分析,验证了模型的合理性和方法的有效性。 In this paper, daily optimal scheduling model for cascade hydropower stations considering the flow delay time was proposed. In this model flow delay time model was expressed as the nonlinear function of the average storage outflow, which could reflect the dynamic character of the delay time among cascade hydropower stations. Meanwhile, in view of the complicated non-linear function, like cascade delay time, hydraulic-electric conversion and piecewise output limit, a novel linear modeling method was proposed. The daily optimal scheduling problem was changed into a linear mixed integer programming problem by introducing multiple sets of state variables and constraints. And then the proposed model was solved by the commercial software of CPLEX. Actual calculation cascade hydropower system ex- ample containing 13 reservoirs and 44 hydropower units was tested. Results show that the proposed optimal model is rational, and the algorithm is effective.
出处 《华东电力》 北大核心 2013年第2期264-269,共6页 East China Electric Power
基金 国家自然科学基金项目(51277071)~~
关键词 梯级水电站 日优化调度 混合整数规划 滞时 线性化建模 cascade hydropower station daily optimal scheduling mixed integer programming delay time linear modeling
  • 相关文献

参考文献6

  • 1SHAWWASH Z K,SIU T K,RUSSELL S O D. The B. C.Hydro short term hydro scheduling optimization model [ J ]. IEEE Transactions on Power Systems,2000,15 ( 3 ) : 1125-1131.
  • 2袁晓辉,王乘,张勇传,袁艳斌.水电系统短期经济运行的新方法[J].水力发电学报,2006,25(4):1-5. 被引量:12
  • 3吴杰康,郭壮志,秦砺寒,宁琳.基于连续线性规划的梯级水电站优化调度[J].电网技术,2009,33(8):24-29. 被引量:30
  • 4邓先礼.时滞对梯级水电站经济运行的影响[J].重庆大学学报,1982(2):91-102.
  • 5DIAZ I P, WILHELMI R J, AREVALO A L. Optimal short-term operation schedule of a hydropower plant in a competitive electricity market [ J ]. Energy Conversion and Management, 2010,51 (12) : 2955-2966.
  • 6BORGHETTI A,D'AMBROSIO C, LODI A, et al. An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir [ J ]. IEEE Transactions on Power Systems ,2008,23 (3) : 1115-1124.

二级参考文献25

共引文献41

同被引文献74

引证文献7

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部