浅埋偏压大断面隧道掘进工艺的改进及应用 被引量:2

Improvement and Application of Excavation Process of Large Section Tunnel with Unsymetrical Pressure and Shallow Bury
在线阅读 下载PDF
导出
摘要 在浅埋偏压特大断面隧道施工进洞过程中,对双侧壁导坑法进行优化改进,利用临时斜撑,对拉锚杆加固核心土。结合隧道施工监控量测,视围岩的变形稳定情况,确定开挖进尺,适时拆除临时支撑。随着该隧道施工进洞安全有序推进,改进后的双侧壁导坑法在龙头山特大断面隧道施工进洞过程中得到成功实践应用。 During the execavation process of the shallow-buride tunnel with unsymmetrical pressure anti large section, the both side drift method is optimized, the temporary supporting is used and the rock bolt is used to reinforce core soil. Combination with thegeological prediction, deformation and stability of surrounding rock we can determine the excavation footage, the timely removal of temporary support. With the tunnel construction in safety and orderly propulsion, the both side drift method with improvement had been successfully applicated in the execavation of Longtoushan tunnel entrance with large section.
出处 《交通标准化》 2013年第11期43-45,共3页 Communications Standardization
关键词 浅埋 偏压 双侧壁导坑法 临时斜撑 shallow-bury unsymetrical pressure both side drift method temporary diagonal support
  • 相关文献

参考文献10

二级参考文献34

共引文献91

同被引文献9

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部