期刊文献+

O/A/O工艺处理规模化畜禽养殖废水工程改造案例分析 被引量:8

Reconstruction Project Example of Treating the Livestock Wastewater by O/A/O Process
在线阅读 下载PDF
导出
摘要 通过对某生猪生产基地原有废水治理工程进行工艺改造,用"O/A/O法+连续循环曝气系统工艺"的新组合工艺取代原有工艺,使高浓度畜禽养殖废水处理设施中COD的去除率达96.7%、氨氮的去除率达84.4%、SS的去除率达98.1%,且该工艺运行成本仅为每吨废水2.09元,在国内典型畜禽养殖废水处理设施中处较低水平。 The original livestock wastewater treatment process was replaced by a new process of "O/A/O + CCAS" in a practical reconstruction project. The new process has proven to be highly effective and efficient in treat livestock high concentration organic wastewater. For Chemical Oxygen Demand ( COD), ammonia nitrogen, suspended solids ( SS), the removal efficiency were 96. 7% , 84. 4%, 98.1%, every index have met the national standard GB18596 - 2001. The new process has the advantages of low running cost, which less than 2. 09 Yuan per ton livestock wastewater, can show great social benefits and economic benefits.
作者 张之浩
出处 《环境与可持续发展》 2013年第3期92-95,共4页 Environment and Sustainable Development
关键词 畜禽养殖废水 O A O工艺 工程改造 案例分析 livestock wastewater O/A/O process reconstruction practical project
  • 相关文献

参考文献5

二级参考文献7

共引文献77

同被引文献81

引证文献8

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部