期刊文献+

隧道掘进中掌子面前方岩石结构的超前预报 被引量:33

PREDICTION OF ROCK STRUCTURE IN FRONT OF FACE DURING TUNNELING
在线阅读 下载PDF
导出
摘要 以地球物理勘探方法进行隧道掘进中前方岩石结构的超前预报,具有快捷、准确和实时处理及显示的优点。通过该方法可及时、详细地了解开挖掌子面前方岩石结构情况,为施工单位合理安排施工进度和减少工程隐患提供依据。以吉林省白山市石碑岭隧道掘进中所进行的超前预报为例,介绍了地质雷达和地震反射波法在这一领域里的应用。 The prediction of rock structure in front of face during tunneling using geophysical methods has the advantage of high speed and accuracy. Using this method, we are accurately informed the rock structure in front of the face of tunneling and we may provide information for further construction. The information is very important in arranging the tunneling method and reducing the risk of work. This paper gives an example of Shibeiling tunnel in Baishan city, Jilin, and introduces the GPR and seismic method applied in the field.
出处 《长春科技大学学报》 CSCD 2000年第1期87-89,97,共4页 Journal of Changchun University of Science and Technology
关键词 掌子面 地质雷达 超前预报 隧道掘进 岩石结构 tunnel face GPR seismic method prediction
  • 相关文献

参考文献2

二级参考文献5

  • 1王惠濂,国外地质勘探技术,1989年,10期,26页
  • 2王惠濂,物探与化探,1992年,16卷,4期,267页
  • 3王惠濂,国外地质勘探技术,1990年,1期,34页
  • 4王惠濂,国外地质勘探技术,1989年,11期,32页
  • 5王惠濂,国外地质勘探技术,1989年,12期,33页

共引文献16

同被引文献257

引证文献33

二级引证文献389

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部