期刊文献+

基于MFGM企业项目链风险元传递研究 被引量:6

Research of Prediction of Enterprise Projects Chain Risk Element Transmission Based on Markov-fourier Modified Grey Prediction Model(MFGM)
在线阅读 下载PDF
导出
摘要 为了对企业项目间风险元传递预测进行研究,本文首先提出项目链风险元传递概念及企业项目链风险传递四面体模型,然后以企业项目链风险传递链式结构为切入点,引入灰色预测、傅里叶级数和马尔科夫链理论,构建了马尔科夫—傅里叶级数修正灰色预测模型(MFGM),用来预测项目链式结构的风险元传递,最后以项目工期为风险元,算例分析基于该模型的项目链风险元传递的预测情况,结果表明该模型具有可行性和有效性。 Due to the research of the enterprise projects risk element transmission forecast, the paper proposed the concept of enterprise projects chain risk element transmission and transfer tetrahedron model. Then, based on the chain structure of enterprise projects chain risk transmission, introduction theory of Grey prediction, Fourier series and Markov chain, established the Markov-Fourier modified grey prediction model(MFGM) , which is used to predict the risk element transmission of projects chain structure. Finally, taken schedule of projects as a risk element, made a prediction of enterprise projects transmission based on the Markov-Fourier modified grey prediction model, and the results show that the model is feasible and effective.
出处 《运筹与管理》 CSSCI CSCD 北大核心 2013年第4期241-247,共7页 Operations Research and Management Science
基金 国家自然科学基金资助项目(71071054 71271084)
关键词 企业项目链 风险元传递 灰色预测 傅里叶级数 马尔科夫链 enterprise projects chain risk element transmission grey prediction fourier series markov chain
  • 相关文献

参考文献27

  • 1孙少楠,王爱领.基于群组AHP的代建制项目风险评价[J].统计与决策,2009,25(1):171-173. 被引量:4
  • 2葛方振,彭太乐,郭桂芳.灰色聚类法在软件项目风险评价中的应用[J].计算机工程与应用,2009,45(20):78-80. 被引量:9
  • 3王寓辰,张金隆,丛国栋.基于粗糙集的IT项目风险评价方法研究[J].工业工程与管理,2006,11(2):87-91. 被引量:9
  • 4Cahit Perkgoz, Amir Azaron, Hideki Katagiri, Kosuke Kato, Masatoshi Sakawa. A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms[J]. European Journal of Operational Research, 2007, (180) : 292-308.
  • 5Stefan Kraupl, Christian Wieckert. Economic evaluation of the solar carbothermic reduction of ZnO by using a single sensitivity analysis and a Monte-Carlo risk analysis[J]. Energy, 2007, (32) : 1134-1147.
  • 6Siu Kui Au, Zhi-Hua Wang, Siu-Ming Lo. Compartment fire risk analysis by advanced Monte Carlo simulation[ J]. Engineer- ing Structures, 2007, (29) :2381-2390.
  • 7Nieto-Morote A, Ruz-Vila F. A fuzzy approach to construction project risk assessment[ J]. International Journal of Project Management, 2011, (29): 220-231.
  • 8Alejandro Balbas, Raquel Balbas, Silvia Mayoral. Portfolio choice and optimal hedging with general risk functions: a simplex- like algorithm [ J]. European Journal of Operational Research, 2009, (192). 603- 620.
  • 9M. De Beule, E. Maes, O. De Winter, W. Vanlaere, R. Van Impe. Artificial neural networks and risk stratification: a promising combination[J]. Mathematical and Comouter Modelllng. 2007. 46. (1 - 2) : 88-94.
  • 10李存斌,王恪铖.网络计划项目风险元传递解析模型研究[J].中国管理科学,2007,15(3):108-113. 被引量:14

二级参考文献123

共引文献148

同被引文献101

引证文献6

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部