期刊文献+

混合梁斜拉桥钢混结合段设计 被引量:14

Design for Steel-Concrete Joint Segment of Cable-stayed Bridge with Hybrid Girder
在线阅读 下载PDF
导出
摘要 钢混结合段的设计是混合梁斜拉桥的关键技术之一,钢混结合段的位置、类型及细部构造设计直接影响到桥梁的安全性和耐久性。结合宁波市福明路斜拉桥钢混结合段的设计,介绍钢混结合段位置的确定、结构形式的选择、细部构造及结构计算分析。分析表明本桥钢混结合段受力合理,传力平顺,刚度过渡平稳。 The design of steel-concrete joint segment is one of the key technologies of a cable-stayed bridge with hybrid girder, while the design of location, type and detail structure of steel-concrete joint segment will directly affect the safety and durability of the bridge. This paper introduces the design of the steel-concrete joint segment of the Fuming Road cable-stayed bridge in Ningbo City, including the determination of location, the selection of structure types, the detail structure, the structure calculation and analysis of steel-concrete joint segment. The results show that this bridge structure is under rational stress state, the force transmission is smooth and the rigidity transition is steady.
作者 蔡建业
出处 《铁道标准设计》 北大核心 2014年第1期68-71,共4页 Railway Standard Design
关键词 斜拉桥 桥塔 钢混结合段 合理位置 结构设计 cable-stayed bridge pylon steel-concrete joint segment rational position structure design
  • 相关文献

参考文献11

二级参考文献59

共引文献359

同被引文献118

引证文献14

二级引证文献122

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部