峻山水库主坝泄洪消能防冲水工整体模型试验 被引量:1

Integral hydraulic model test of main dam energy dissipation and scour prevention structure for Junshan Reservoir
在线阅读 下载PDF
导出
摘要 针对峻山水库主坝下游左岸突出山体带来的下游消能问题,通过多方案的比较试验研究,论证溢流坝平面布置的合理性,推荐适合工程实际的消能方案,该方案较好地解决了溢流坝下游消能防冲问题。工程以推荐方案为依据进行设计施工,目前已通过竣工验收投入使用。 Protruding mountain body on the left bank downstream of main dam of Junshan Reservoir leads to energy dissipation problem. By comparative tests and study of multiple alternatives, the rationality of overflow dam layout plan was demonstrated, and a energy dissipation scheme suited to the actual conditions of the project was recom- mended, as a good solution for overflow dam energy dissipation and scour prevention. The project had been de- signed and constructed according to the recommended scheme, and had been put into operation after completion acceptance.
作者 杜念
出处 《广西水利水电》 2013年第6期6-9,16,共5页 Guangxi Water Resources & Hydropower Engineering
关键词 溢流坝 消能 防冲 水工模型 试验 峻山水库 Overflow dam energy dissipation scour prevention hydraulic model test Junshan Reservoir
  • 相关文献

参考文献1

  • 1广西水利科学研究院.桂林市恭城县峻山水库主坝泄洪消能防冲水工整体模型试验报告[R].南宁:广西水利科学研究院,2010.

同被引文献13

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部