摘要
通过对单桩竖向抗压静载荷试验进行快速加载法和慢速加载法对比分析,明确了快速法静载试验各级荷载维持时间及沉降稳定标准,验证了快速法的可行性和准确性,大大缩短了试验周期。
Through the analysis on rapid loading method and slow loading method of single pile vertical compressive static load test, this paper cleared each load duration times and settlement stability criteria of rapid loading method static test, verified the feasibility and accuracy of rapid method, greatly shortened the test cycle.
出处
《山西建筑》
2014年第6期69-70,共2页
Shanxi Architecture
关键词
快速法
慢速法
对比
沉降
rapid method, slow method, contrast, settlement