根据全过程的沉降量与时间关系的特点,建立了泊松曲线预测模型,然后将该模型应用于某些具体的工程,证实了该方法的合理性,最后指出了值得进一步研究的问题。
Based on the settlement-time relation during the whole process of construction and operation, forecast model of Poisson curve is established. Then the model is used to forecast some projects. These forecast results prove the reasonableness of the model. In the end, the worth researching problem is pointed out.