1TRB. Highway Capacity Manual. Transportation Research Board, Washington D. C. 2000.
2Janusz chodur. Capacity of Unsignalized Urban Junctions. Transportation Research Circular E - C018: 4th International Symposium on Highway Capacity. 2000.
4Moshe A,Pollatschek,Abishai Polus,Moshe Livneh. A decision model for gap acceptance and capacity at intersections. Transportation Re- search Part B 36 (2002) 649 - 663.
5Werner Brilon, Ning Wu. Capacity at unsignalized two - stage priority intersections. Transportation Research Part A 33 ( 1999 ) 275- 289.
4[1]Drew D R,Traffic Flow Theory and Control[M]. New York: McGraw-Hill,1968.
5[2]Harders J.The capacity of unsignalized urban intersection[A].Forschung Strabenbau and Strabenverkehrstechnik[C].German Heft 76,1968.
6[3]Troutbeck R J.Average delay at an unsignalized intersection with two major streams each having a dichotmized headway distribution[J].Transportation Science,1986,20(4):272-286.
7[4]Troutbeck R J.Unsignalized intersection and roundabouts in Australia:recent development[A].Intersection without Traffic Signals Ⅱ[C].Berlin:Spring-verlag,1991.
8[5]Cowan R J,An extension of Tanner's results on uncontrolled intersection:clarification of some issues[J].Queuing System,1987,6(1):249-263.
9[6]Al-Masaeid H R.Capacity of one-way yield-controlled intersections[J].Transportation Research Record,1995,148(4):9-15.
10[7]Hagring O.A further generalization of Tanner's formula[J].Transportation Research Part B,1998,32(6):423-429.