期刊文献+

基于双标准的物流配送延误时间管理研究 被引量:2

Study on Delay Time Management of Logistics Distribution Based on Double Standards
在线阅读 下载PDF
导出
摘要 针对物流配送过程中产生的延误,构建一种双标准延误时间管理的模型.在运输延误不可避免的情况下,该模型为配送中心管理员提供未来一段时间内车辆进出站的时间优化方案,尽量降低配送的延误时间和延误的后续影响.结合某一物流配送中心的工作时间表,通过收缩法对模型进行了验证,取得了很好的效果. This paper produced in the process of logistics distribution delay,and built the double-standard model of the delay of time management.In the case of transport delay is inevitable,the model for distribution center administrat-ors provide the short-term optimization scheme of vehicle in and out of the station time,minimizing the de-lay of delivery time and the aftermath of a delay.Combined with a logistics distribution center work sche-dules,the model is verified by contracting method good results have been achieved.
出处 《武汉理工大学学报(交通科学与工程版)》 2014年第3期483-487,共5页 Journal of Wuhan University of Technology(Transportation Science & Engineering)
基金 国家西部交通科技项目资助(批准号:2009328222021)
关键词 物流配送 双标准 延误时间管理 logistics distribution double standard delay time management
  • 相关文献

参考文献9

二级参考文献34

  • 1肖增敏,李军.动态网络车辆路径问题:研究现状及展望[J].系统工程,2004,22(7):68-71. 被引量:14
  • 2鲍尔索克斯 克劳斯.物流管理[M].北京:机械工业出版社,1999..
  • 3中田信哉.物流-配送[M].深圳:海天出版社,2001..
  • 4艾瑞咨询.中国互联网络信息中心2012年第二季度电子商务核心数据发布[EB/OL].www.iresearch.com.cn.
  • 5Kallantzis A, Soldatos J, Lambropoulos S. Linear versus network scheduling:a critical path comparison[J]. Journal of Construction Engineering and Management, 2007, 133(7): 483491.
  • 6Arditi D, Tokdemir O B, Suh K. Effect of learning on line-of-balance scheduling[J]. International Journal of Project Management, 2001, 19(5): 265-277.
  • 7O'Brien J J. VPM scheduling for high-rise buildings[J]. Journal of the Construction Division, 1975, 101(4): 895-905.
  • 8Reda R M. RPM: Repetitive project modeling[J]. Journal of Construction Engineering and Management, 1990, 116(2): 316-330.
  • 9Duffy G A, Oberlender G D, Jeong D H S. Linear scheduling model with varying production rates[J]. Journal of Construction Engineering and Management, 2011,137(8): 574-582.
  • 10Prabuddha D E, Dunne E J. Complexity of the discrete time-cost tradeoff problem for project networks[J]. Operations Research, 1997, 45(2): 302-306.

共引文献51

同被引文献10

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部