期刊文献+

反铲挖掘机铲斗油缸最大挖掘力测量方法研究 被引量:2

Research on the Test Method of Maximum Digging Force about Backacter Bucket Cylinder
在线阅读 下载PDF
导出
摘要 现阶段执行的国家标准要求的铲斗油缸单独作用下的最大挖掘力测量位置与实际可测量位置不在同一点,且现有的最大挖掘力的一般计算方法未考虑伸缩臂式挖掘装置和铲斗摇臂特殊位置的需求。通过建立铲斗相关结构模型,考虑伸缩臂结构和摇臂的特殊结构以及测试过程的实际情况,分析实际测力位置与标准要求位置处最大挖掘力的关系,提供了实际可行的最大挖掘力测量方法。通过试验验证了该方法的可行性,为最大挖掘力的测试、评价提供参考。 The test positions of bucket cylinder's maximum digging force are different between national standard's demands and attainable actuality,and the maximum digging force's simple algorithm unconsidered the demands of telescopic excavator and the bucket linkage's walking bar rod. According to the special structures and the actuality of test, a new algorithm about bucket cylinder's maximum digging force is built through the bucket' structural model, and the maximum digging force's relationship of national standard's demands and attainable actuality are got,whicb offer a practicable algorithm. A test results certify that the test method is adaptive for test and evaluation.
出处 《机械工程师》 2014年第8期45-47,共3页 Mechanical Engineer
关键词 反铲挖掘机 伸缩臂 摇臂 铲斗油缸 最大挖掘力 backacter telescopic ann walking bar rod bucket cylinder maximum digging force
  • 相关文献

参考文献1

二级参考文献15

  • 1吴晓敏,陈玲.耗散系统的动力学方程[J].长春理工大学学报(自然科学版),2004,27(3):10-12. 被引量:2
  • 2刘正君.MATLAB科学计算与可视化仿真[M].北京:电子工业出版社,2009.
  • 3王久聪.WS-005型挖掘机试验台提升机构动载荷分析[J].矿山机械,1987,(2):15-22.
  • 4Samuel Frimpong, Yafei Hu, Kwame Awuah-Offei. Mechanics of cable shovel- formation interactions in sur- face mining excavations [ J ]. Journal of Terramechan- ics, 2005, 42: 15-33.
  • 5A.J.Koivo, M.Thoma. Modeling and control of excava- tor dynamics during digging operation [ J ] . Journal of aerospace engineering. 1996, (01) : 10-18.
  • 6A. Las Benitez Leeds. The random vibration of mechani- cal systems [ M ] , Higher Education Press, 1987.
  • 7Vincenzo Gattulli, Luca Martinelli, Federico Perotti, etal. Dynamics of suspended cables under turbulence loading: Reduced models of wind field and mechanical system [ J ] . Journal of Wind Engineering and Industrial Aerodynamics, 2007, 95 (3) : 183-207.
  • 8诸乃雄.机床动态分析原理与应用[M].上海:同济大学出版社,1987:6-7.
  • 9Samuel Frimpong, Ying Li. Stress loading of the cable shovel boom under in-situ digging conditions [J ]. Engineering FailureAnalysis, 2007, 14. 702-715.
  • 10太原重型机械设计研究所.P&H2300XP测试报告(内部数据),1990.

共引文献1

同被引文献12

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部