期刊文献+

基于模糊AHP和TOPSIS的铁路选线方案研究 被引量:4

Study on Railway Path Selection Scheme Based on Fuzzy AHP and TOPSIS
在线阅读 下载PDF
导出
摘要 铁路选线是铁路设计中最根本、最重要的工作,是影响全局性的总体工作,线路选线的质量将直接关系到铁路工程建设的可靠性、安全性、技术可行性和经济合理性及社会接纳性,关系到铁路和地方经济社会的发展,因而它是高速铁路建设应重视的首要问题。文中运用三角模糊语言变量,将专家意见转换成三角模糊数并构建模糊决策判断矩阵,再结合层次分析法(AHP)对判断矩阵进行模糊变换和向量计算,然后运用TOPSIS方法计算各方案与理想值的相对贴近度并做出决策。最后以三个方案作为实例进行了验证,进一步为铁路线路方案选择提供决策参考。 Railway location is the most fundamental and important work in railway design,which is the overall work affecting the whole. The quality of route location will directly affect the reliability,safety,technical feasibility,economic rationality and social admissibility of railway construction as well as development of railway and local economic sociality. Therefore it is the first question to be valued for rail-way construction. First,use the triangular fuzzy linguistic variables to transform the expert opinion to fuzzy variable and construct the fuzzy decision matrix. Then,apply the AHP to fuzzy transform and vector computing for judge matrix,the TOPSIS is used to calculate the related similarity degree between each scheme and ideal value and make decision. At the end,with the three cases as the instance to veri-fy,provide a decision reference for railway path selection.
出处 《计算机技术与发展》 2014年第10期182-185,共4页 Computer Technology and Development
基金 国家"863"高技术发展计划项目(2007AA01Z126)
关键词 指标体系 三角模糊 层次分析法 TOPSIS decision system triangular fuzzy variable AHP TOPSIS
  • 相关文献

参考文献13

二级参考文献44

共引文献150

同被引文献62

引证文献4

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部