针对地铁安装工程管线综合施工中存在的问题,在地铁安装中引入BIM技术,将二维设计图整合成三维立体图像,并且直观地对原管线综合设计部分进行分析与优化;通过在上海轨道交通11号线石龙路站、大连地铁1号线春光街站中建立BIM模型,有效解决综合管线碰撞问题。
For problems existing in the comprehensive construction of pipeline of underground installation,BIM technology is introduced in the installation,which transforms the 2 dimensional drawings into 3 dimensional images and makes a reality the analysis and modification of intuitive design in the form of 3 dimension visualization.Through BIM model established in Shilong road station on Shanghai rail transit line 1 1 and Dalian Chunguang street station of metro line 1 ,the problem of comprehensive pipeline collision were effectively solved.
出处
《铁道建筑技术》
2014年第9期93-95,共3页
Railway Construction Technology
关键词
地铁车站
BIM
机电安装
碰撞检测
metro station
BIM
mechanical and electrical installation
collision detection