期刊文献+

高水压砂性土层大直径盾构到达施工技术 被引量:1

Construction Technology of Large Diameter Shield Achievement with High Water Pressure and Sandy Soil
在线阅读 下载PDF
导出
摘要 高水压盾构的到达是隧道修建过程中最关键且最危险的环节,在高水压作用下仅依靠传统的单一的加固技术不能很好的保证该段施工的安全性。为解决这一问题,以南京地铁十号线越江段为例,主要介绍其盾构到达过程中采用的冻结法+水中到达法的施工技术要点及注意事项,为其他高水压盾构接收施工提供技术参考。 The achievement of the shield with high water pressure is the most critical and most dangerous link in tunnel construction process.With the high water pressure,the traditional single reinforcement technique can not guarantee the safety of the segment construction well.In order to solve this problem,this paper takes river-crossing section of Nanjing subway line 10 as the example to mainly introduce the construction technology key points and matters needing attention of freezing method + water achievement method in shield achievement process to provide technology references for other shield receiving construction with high water pressure.
作者 马军
出处 《价值工程》 2015年第14期138-139,共2页 Value Engineering
关键词 高水压隧道 盾构到达 施工技术 tunnel with high water pressure shield achievement construction technique
  • 相关文献

参考文献3

二级参考文献10

共引文献37

同被引文献1

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部