工程管理软件Project 2007在化工装置大修应用

Project 2007 Application in Petrochemical Plant Overhaul
在线阅读 下载PDF
导出
摘要 现代石油化工装置大修实施阶级是一项复杂的过程管理,用传统的方法统计人员、机具数量及任务完成情况,从而实行资源有效的调配,实现施工作业过程的管理,已不适用,必须要有高效的辅助手段。微软公司发布Project 2007软件功能强大、实用性、操作性都能满足此方面的要求。本文通过具体案例的分析,探讨利用Project 2007软件在大修实施过程中如何进行人员、机具及任务完成的统计。 The aoverhaul implementation phase of modem petrochemical plant is a complicated process management. Our traditional methods of personnel control, machines and tools calculation and target performance monitoring are not applicable anymore in realizing the effective deploy of resources and overall management of the operation process, more effective supplementary instrument is needed. The Microsoft software Project 2007, which was powerful in practicability and operability, was recommended. By real cases analyzing, the importance and utility of Project 2007 in petrochemical plant overhaul process management in personnel control, machines and tools calculation and target performance monitoring were discussed.
作者 李斌
出处 《广州化工》 CAS 2015年第9期233-235,共3页 GuangZhou Chemical Industry
关键词 PROJECT 2007应用 石油化工 大修 人员机具 任务 统计 Project 2007 application petrochemical overhaul personnel machines and tools target monitor
  • 相关文献

参考文献4

二级参考文献5

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部