期刊文献+

大跨隧道下穿建筑物施工方案对比分析及施工技术 被引量:7

Comparison Analysis of Tunnel Construction Schemes Under-crosssing Buildings and its Construction Technique
在线阅读 下载PDF
导出
摘要 以洛阳周山隧道下穿村庄民房为工程背景,采用FLAC3D建立三维数值模型对比分析了三台阶法和CD法下穿施工引起建筑物变位、隧道支护受力及隧道周边地层塑性区分布规律等,确定采用CD法施工。在施工过程中对建筑物沉降进行监测,结果表明,建筑物沉降规律与数值模型计算结果吻合较好,保证了建筑物的安全。 Taken Zhoushan tunnel undercrosssing building as background, by use of three dimensional numerical models, comparisons between the simulated results of three-benched and CD methods, such as building settlements caused by tunneling, stress of primary support and plastic zone distribution, are analyzed. On the basis of the comparison results, the CD method is determined to excavate tunnel undercrosssing the building. The monitoring results of building settlement during tunneling have shown that simulated struction method has results have good agreement with those of monitoring ones, and the adopted conguaranteed the safety of the building.
作者 陈智慧
出处 《石家庄铁道大学学报(自然科学版)》 2015年第2期50-56,共7页 Journal of Shijiazhuang Tiedao University(Natural Science Edition)
关键词 大跨隧道 下穿建筑物 三维数值模型 沉降控制 沉降监测 tunnel with lagre span undercross building 3D numerical model settlement control settlement monitoring
  • 相关文献

参考文献6

二级参考文献42

共引文献188

同被引文献51

引证文献7

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部