摘要
地铁建设过程中如何控制临近建筑物的沉降变化,是地铁安全风险控制中的一个重点问题。以北京某地铁暗挖车站为例,通过分析监测数据,分析引起建筑物沉降的影响因素,为类似工程提供参考。
The control of sedimentation changes of the adjacent buildings has become a key problem in the risk control of underground construction. In this thesis,an underground subsurface excavated station in Beijing is taken as an example. Through the analysis on the monitoring data,the factors that influence the sedimentation of buildings are illustrated and the results will definitely contributes to the development of similar projects.
出处
《北方交通》
2015年第6期109-112,共4页
Northern Communications
关键词
暗挖车站
临近建筑物
沉降监测
Subsurface excavated station
Adjacent buildings
Sedimentation monitor