摘要
以辽宁省大伙房水库二期工程为研究背景,在对长距离有压输水工程中水锤现象产生的原因进行分析的基础上,提出了设置2座单向调压塔和6座双向稳压塔防止水锤效应发生的思路和方法。
Dahuofang Reservoir Stage II Project in Liaoning Province is adopted as research background for analyzing causes of water hammer phenomena in long-distance pressure water conveyance project. On the basis, two one-way pressure regulating towers and six two-way pressure regulating towers are set for preventing water hammer effect. The idea and method are proposed.
出处
《水利建设与管理》
2015年第9期35-37,共3页
Water Conservancy Construction and Management
关键词
长距离
有压输水
水锤防护
系统设计
long distance
pressure water conveyance
water hammer prevention
system design