期刊文献+

资源紧缺型集装箱码头多类型场桥配置问题研究

Multi-type Crane Deployment Problem for Resource Limited Container Terminals
在线阅读 下载PDF
导出
摘要 针对资源紧缺型集装箱码头场桥配置特点,探索堆场场桥配置问题.使用运筹学线性规划方法,建立集装箱码头堆场场桥配置混合整数规划模型,模型能够处理码头多类型场桥配置问题.数值实验部分,结合港口实际情况设计算例验证模型的有效性,同时对模型进行较为完整的场景分析,包括初始场桥分配、场桥作业性能及场桥资源数量,指出其对实际堆场管理的意义.实验结果显示,本文建立的场桥配置问题能够较好地解决资源紧缺型集装箱码头场桥配置问题,为实际港口操作提供决策支持. This paper researches on the yard crane deployment problem in most Asian container ports. A mixed integer programming is built by using linear programming method. This model can solve the multi-type yard crane deployment problem well. In numerical experiments, a simper case is designed to test the model reliability and accuracy, and analyzes a set of scenarios such as initial yard crane allocation, yard crane performance and yard crane number. It points out many management meanings in container terminal practical operation. Experiments results show that the proposed model can deal with multi-type yard cranes deployment problem in Asian port terminals and can provide decision support for terminal manager.
出处 《交通运输系统工程与信息》 EI CSCD 北大核心 2016年第1期229-236,共8页 Journal of Transportation Systems Engineering and Information Technology
基金 国家自然科学基金项目(51409157) 上海市晨光计划项目(14CG48) 上海市扬帆计划项目(14YF1411200) 教育部博士点科研基金(20133121110001) 上海市教委科研创新项目(13YZ080 14YZ112) 上海海事大学研究生创新基金项目(2015YCX063) 上海海事大学优秀博士学位论文培育项目(2015BXLP006)~~
关键词 水路运输 集装箱码头优化 多类型 混合整数规划 资源紧缺 waterway transportation container terminal optimization multi-type crane deployment mixed integer programming resource limited
  • 相关文献

参考文献17

  • 1Drewry Maritime Research. Quarterly forecasts of the container market[R]. London, 2015.
  • 2Price Waterhouse Coopers. The World in 2050: Will the shift in global economic power continue?[R]. UK, 2015.
  • 3Vis I F A, de Koster R. Transshipment of containers at a container terminal: An overview[J]. European Journal of Operational Research, 2003, 147(1): 1-16.
  • 4Steenken D, Vo? S, Stahlbock R. Container terminal operation and operations research- a classification and literature review[J]. OR Spectrum, 2004, 26(1): 3-49.
  • 5Stahlbock R, Vo? S. Operations research at container terminals: a literature update[J]. OR Spectrum, 2008, 30 (1): 1-52.
  • 6Kim K Y, Kim K H. Heuristic algorithms for routing yard- side equipment for minimizing loading times in container terminals[J]. Naval Research Logistics, 2003, 50(5): 498-514.
  • 7He J L, Chang D F, Mi W J, et al. A hybrid parallel genetic algorithm for yard crane scheduling[J]. Transportation Research Part E: Logistics and Transportation Review, 2010, 46 (1): 136-155.
  • 8Chang D F, Jiang Z H, Yan W, et al. Developing a dynamic rolling-horizon decision strategy for yard crane scheduling[J]. Adv. Eng. Inform, 2011, 25 (3) : 485-494.
  • 9Yan W, Huang Y F, Chang D F, et al. An investigation into knowledge-based yard crane scheduling for container terminals[J]. Advanced Engineering Informatics, 2011, 25(3): 462-471.
  • 10He J L, Huang Y F, Yan W. Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption[J]. Advanced Engineering Informatics, 2015, 29 (1): 59-75.

二级参考文献13

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部