隧道开挖方法对邻近既有桥梁影响的数值分析 被引量:6

Numerical Simulation Analysis of Inf luence of Tunnel Excavation Method on near Existing Bridge
在线阅读 下载PDF
导出
摘要 结合大连地铁春光街车站工程,通过数值模拟方法,在隧道下穿既有运营桥梁过程中,首先在不进行围岩注浆加固的情况下,对比分析了"两台阶"、"三台阶"的开挖方法对桩基及承台的影响;继而在隧道内进行不同程度的加固条件下,对比分析了"两台阶"、"三台阶"的开挖方法对桩基及承台的影响;最后给出了适宜的洞内加固参数和开挖方法。 Numerical simulation was carried out based on the project of Chunguang Street Station of Dalian Subway. The tunnel went through beneath the existing bridge in service. Different excavation methods were compared. Firstly,the effects of two-bench and three-bench excavation on piles and platform were analyzed in the case of non-reinforced surrounding rock with grouting. Secondly,the effects were analyzed in the case of reinforced surrounding rock with grouting. Based on the comparison,appropriate parameters for inner reinforcement were proposed and proper excavation method was suggested.
作者 刘金山
出处 《铁道建筑》 北大核心 2016年第4期60-63,共4页 Railway Engineering
关键词 隧道施工 既有桥梁 洞内加固 位移 数值模拟 Tunnel construction Existing bridge Inner reinforcement Displacement Numerical simulation
  • 相关文献

参考文献5

二级参考文献13

共引文献15

同被引文献44

引证文献6

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部