期刊文献+

BIM技术在施工阶段的成本控制管理 被引量:57

BIM TECHNOLOGY IN CONSTRUCTION STAGE OF COST CONTROL MANAGEMENT
在线阅读 下载PDF
导出
摘要 施工阶段是成本发生和资源消耗的主要阶段,控制该阶段的成本是建筑行业提高效率及增加利润的关键内容。我国施工阶段控制存在问题较多。从技术层面和管理层面分析,与国外工程造价施工阶段管理有较大的差距。通过传统工程造价结合现代信息技术的方式,可降低建筑能耗、合理利用资源及建设造价发生,BIM技术成为建筑信息化的一个关键环节。 The construction stage is the main stage of cost and resource consumption, and the cost of controlling the stage is the key content of the construction industry to improve efficiency and increase profits. There are many problems in the control of construction stage in our country. From the technical level and management level analysis, and foreign engineering cost construction stage management has a larger gap. By combining the traditional engineering cost with the modern information technology, it can reduce the building energy consumption, rational use of resources and construction cost, in which BIM technology has become a key link in the construction of information technology.
作者 赵占军
出处 《建筑技术》 北大核心 2016年第6期567-570,共4页 Architecture Technology
关键词 BIM 施工管理 成本管理 BIM construction management cost management
  • 相关文献

参考文献6

二级参考文献26

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:109
  • 2CHAU K W, ANSON M, ZHANG J P. 4D dynamic construction management and visualization software: 1. development [J]. Automation in Construction, 2005, 14 (4) :512-524.
  • 3CHAU K W, ANSON M, SARAM D D D. 4D dynamic construction management and visualization software: 2. site trim [J]. Automation in Construction, 2005, 14 (4) :525-536.
  • 4WANG H J, ZHANG J P, CHAU K W, et al. 4D dynamic management for construction planning and resource utilization [ J ]. Automation in Construction, 2004, 13 (5) :575-589.
  • 5CHAU K W, ANSON M, ZHANG J P. Four-dimensional visualization of construction scheduling and site utilization [ J ]. Journal of Construction Engineering and Management, 2004, 130 (4) :598-606.
  • 6ZHANG J P, HU Z Z. B1M-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. principles and methodologies [ J ]. Automation in Construction, 2011,20 (2) : 155-166.
  • 7POPOV V, JUOCEICIUS V, MIGILINSKAS D, et al. The use of a virtual building design and construction model for de- veloping an effective project concept in 5D environment [ J]. Automation in Construction, 2010, 19 (3) :357-367.
  • 8KYMMELL W. Building information modeling: planning and managing construction projects with 4D CAD and simulations [ M ]. New York : McGraw-Hill, 2008.
  • 9LI H, CHAN N, HUANG T, et al. Optimizing construction planning schedules by virtual prototyping enabled resource a- nalysis [ J]. Automation in Construction, 2009, 18 (7) :912-918.
  • 10GOEDERT J D, MEADATI P. Integrating construction process documentation into building information modeling [ J ]. Journal of Construction Engineering and Management, 2008, 134 (7) :509-516.

共引文献90

同被引文献238

引证文献57

二级引证文献266

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部