新疆某水利枢纽工程导截流设计

River diversion and closure design of a hydraulic complex in Xinjiang
在线阅读 下载PDF
导出
摘要 结合新疆某水利枢纽的实际情况,论述了工程导截流设计的原则和方案,根据相关设计规范,分析确定了导流及度汛标准、导截流建筑物的布置、规模及导截流时段。施工实践证明:该导截流设计合理,运行效果良好。 Combined with the situation of a hydraulic complex in Xinjiang, the author discussed the principle and scheme of river diversion and closure design. According to relevant design specifications, analysis was made on the diversion and flood control standard, size and arrangement of structures, time period of river diversion and closure. Construction practice has proved the river diversion and closure design is proper with good operation effects.
作者 刘攀
出处 《广西水利水电》 2016年第3期46-47,70,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 导截流 建筑物 设计 时段 方式 River diversion and closure structure design time period way
  • 相关文献

参考文献5

  • 1SL303-2004水利水电施工组织设计规范[S].
  • 2SL279-2002.水工隧洞设计规范[S].[S].,..
  • 3李炜.水利计算手册[M].北京:中国水利水电出版社,2006.
  • 4邱秀云.水力学[M].乌鲁木齐:新疆电子出版社,2008:282-303.
  • 5SL623-2013,水利水电工程施工导流设计规范[s].

共引文献133

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部