摘要
以天津高银117大厦为例,为解决超高层建筑隔墙施工的整体稳定、耐火性及抗风压等性能问题,采用轻钢龙骨石膏板墙体,使施工质量得到了控制,确保优质、快速、高效地完成施工任务。
Based on Tianjin Gaoyin 117 building, in order to solve the problems of integral stability, fire resistance and resistance to wind pressure for the construction of high rise building, this project uses light steel keel gypsum board wall. The construction quality is under control, high-quality, construction period and effect of construction tasks are ensured.
作者
董志国
孙长礼
叶建
付国
李国喜
Dong Zhiguo Sun Changli Ye Jian Fu Guo Li Guoxi(General Construction Company of CCTEB Group Co. , Ltd. , Wuhan, Hubei 430064, Chin)
出处
《施工技术》
CAS
北大核心
2016年第19期7-9,共3页
Construction Technology
关键词
高层建筑
隔墙
轻钢龙骨
防震
抗风压
施工技术
tall buildings
partition
light steel keel frame
shockproof
wind loadresistance
construction