高填方路堤工后沉降监测试验研究 被引量:25

Experimental Study on Monitoring of Post-construction Settlement of High-filled Embankment
原文传递
导出
摘要 为探讨高填方路堤在自重应力和汽车荷载作用下的工后沉降,在兰永一级公路某高填方路堤进行了工后沉降现场监测,分别在行车道和路肩位置布置单点沉降计,监测了工后沉降变化情况,分析了高填方路堤沉降随时间和空间的变化规律。以填方路基工后沉降原位监测结果为基础,探讨了高填方路基工后沉降预测回归模型。研究结果表明:路肩位置沉降大于行车道位置沉降;路基沉降随时间增加而增大,高填方路堤填筑结束1 a后沉降趋于稳定;汽车荷载作用下路堤沉降不会出现较大的增长趋势;对数模型能较真实地反映高填方路基的工后沉降规律。 To explore the post-construction settlement of high-filled embankment under the action of self weight stress and vehicle load,the post-construction settlement of a high-filled embankment of LanzhouYongjing first grade highway is monitored on site.Single-point settlement meter is embedded in the driveway and shoulder position,and the post-construction settlement is monitored.The regularities of the settlement varying with time and space are analyzed.Based on the in-situ monitoring data of post-construction settlement of the filled embankment, some regressive models for predicting the post-construction settlement are discussed.The result shows that(1) the settlement of shoulder position is greater than that of driveway position;(2) the settlement of embankment increases with time going, the settlement of high-filled embankment tends to be stable one year after filling;(3) under the action of vehicle load,the settlement of the embankment will not has a big growth;(4) logarithm model can disclose the regularity of the postconstruction settlement of high-filled embankment.
出处 《公路交通科技》 CAS CSCD 北大核心 2017年第3期15-19,25,共6页 Journal of Highway and Transportation Research and Development
基金 国家自然科学基金项目(51568044) 甘肃省交通厅建设科技项目(2013-0613)
关键词 道路工程 工后沉降 试验研究 高填方路堤 road engineering post-construction settlement experiment research high-filled embankment
  • 相关文献

参考文献18

二级参考文献139

共引文献313

同被引文献247

引证文献25

二级引证文献108

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部