期刊文献+

缩短10kV及以下三相电能表换表时间对策的研究 被引量:2

Study on the Strategy of Shortening Time for Changing Three-phase Kilowatt-hour Meter of Line up to 10 kV
在线阅读 下载PDF
导出
摘要 换表时间长将引起漏计电量和线材损耗问题,降低工作效率,对供电企业造成电量损失。通过对导致换表时间延长的原因进行总结分析,提出相关对策,并从可行性、安全性等5个方面进行综合评估,最终确定宜采用可调式连接件的方案。经现场试验证明,可调式连接件可明显降低换表时间,给供电企业带来一定的社会效益和经济效益。 Changing meter for a long time can cause electricity omission and wire loss,reduce work efficiency and result in electric quantity loss of power supply enterprise.By analysis,some effective measures is put forward.Though comprehensive evaluation of feasibility,safety and other three aspects,the measure of adjustable connector is laid down.Field test demonstrates that adjusted fittings can obviously reduce time of changing meter which bring economic benefit and social benefit for power supply enterprise.
作者 李思远 李彤 魏宁 王颖 LI Siyuan LI Tong WEI Ning WANG Ying(State Grid Electric Power Supply Company, Anshan, Liaoning 114001, China)
出处 《东北电力技术》 2016年第11期22-24,共3页 Northeast Electric Power Technology
关键词 换表时间 原因分析 对策研究 changing meter time cause analysis countermeasure research
  • 相关文献

参考文献4

二级参考文献10

  • 1郭兴昕,贾军.智能电能表发展历程及应用前景,2011.
  • 2王利宁.智能电能表知识简介,2011.
  • 3陈启卷主编.电气设备及系统[M]. 中国电力出版社, 2006
  • 4国家发展改革委价格司.输配电定价成本监审办法(试行)[Z],2015.
  • 5国家发展改革委.关于推进电力市场建设的实施意见[Z],2015.
  • 6山西省发展改革委.山西省电力体制改革综合试点方案[Z],2016.
  • 7国家发展改革委.关于有序放开发用电计划的实施意见【Z],2015.
  • 8国家发展改革委.关于推进售电侧改革的实施意见[Z],2015.
  • 9庄葛巍.智能电能表零线电流测量功能的应用分析[J].供用电,2011,28(3):18-19. 被引量:7
  • 10贺青.对智能电表“智能”的思考[J].中国仪器仪表,2012(1):67-70. 被引量:4

共引文献12

同被引文献13

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部