200MW机组中压转子末级叶片拉筋改进 被引量:5

Improve Intermediate Pressure Rotor's Last Stage Blade Lacing Wire of 200MW Unit
在线阅读 下载PDF
导出
摘要 介绍了邯郸热电厂 2 0 0MW机组大修中 ,中压转子末级叶片组频率落入危险的共振区。为保证叶片组频率的合格 ,对中压转子末级叶片拉筋进行了改进 ,由成组焊接拉筋改成整圈松拉筋型式 ,使汽轮机的经济性。 This paper introduces the Handan Co generation Power plant, intermediate pressure rotor's last stage-blade frequency reach dangerous resonance area when 200MW units were overhauled .In order to ensure the qualification of batches of blades frequency, we improved intermediate pressure rotor's last stage blade and changed batches of jointing lacing wire into circles of loose lacing wire, so that make the reliable assurance of economy safety and overhaul time limit for project of steam turbine.
作者 王玉武
机构地区 邯郸热电厂
出处 《汽轮机技术》 北大核心 2002年第4期242-243,245,共3页 Turbine Technology
关键词 200MW机组 中压转子 末级叶片 拉筋 热电厂 频率 intermediate perssure rotor last stage blade frequency batches of jointing lacing wire crcles of loose lacing wire improvement
  • 相关文献

同被引文献30

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部