BIM技术在房地产项目成本控制中的应用研究 被引量:4

Research on the Application of BIM Technology in the Cost Control of Real Estate Project
在线阅读 下载PDF
导出
摘要 BIM技术的发展带动了工程建设项目的协同工作和信息共享。论文基于BIM技术,对A体育馆项目的成本控制进行深入研究,建立BIM模型,进行工程量统计、挣值分析和预测分析,绘制施工期间完成估算预测趋势图,为项目参与各方提供科学的决策参考依据,提高成本管理的效率。 The development of BIM technology has promoted the cooperation and information sharing of engineering construction projects.Based on the BIM technology, paper researches the cost control of A stadium project, establishes BIM model, and does quantity statistics, analysis and prediction of earned value analysis, draws the tendency chart of estimation forecast during the construction, to provide scientific basis for decision-making for the parties involved in a project, and improve the efficiency of cost management.
作者 刘华科 孙迎
出处 《中小企业管理与科技》 2017年第28期81-82,共2页 Management & Technology of SME
关键词 建筑信息模型 挣值分析 成本控制 BIM earned value analysis cost control
  • 相关文献

参考文献4

二级参考文献22

  • 1中国报告大厅.(2015年房地产行业市场现状及面临的形势分析》,http://www.chinabgao.com/irlfo/80518.html.
  • 2中国产业信息网.《2015年中国房地产行业市场现状及发展趋势》,http://www.chyxx.corn/industry/201507/329852.html.
  • 3王海春.《千亿海外资金进中国楼市遇花不出去难题》,《华夏时报》2015年5月14日.
  • 4中国外汇网.《2015年上半年人民币汇率走势和外汇市场交易情况》,http://www.chinaforex.eom.cn/index.php/cms/item—view—id-37895.shtml.
  • 5中国陶瓷官网.《2015年9月中国外汇储备3.51万亿美元环比减少432亿美元》,http://www.ccia086.conr/Infirmation/InfoContent/7966/6/7.html.
  • 6Lee S, Kim K, Yu J. BIM and ontology-based approach for building cost estimation[J]. Automation in Constrton, 2014, 41 (10): 96-105.
  • 7Monteiro A, Pocts Martins J. A survey on modeling guidelines for quantity takeoff-oriented BIM-based design[J]. Automation in Construction, 2013, 35 (10).
  • 8Becerik-Gerber B, Jazizadeh F, Li N, etal. Application areas and data requirements for BIM-enabled facilities nmnagement[J]. Journal of Construction Engineering and Management-Asce, 2012, 138 (3).
  • 9Kamn E P, Irizarry J. Developing a spatial data framework for facility management supply chains[C]. Atlanta, GA, United states: American Society of Civil Engineers (ASCE), 2014.
  • 10Cheung F K T, Rihan J, Tah J, et al. Early stage multi-level cost estimation for schematic BIM model[J]. Automation in Construction, 2012, 27 (5) : 67-77.

共引文献59

同被引文献19

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部