摘要
结合东非某工程12 mm壁厚钢管桩沉桩实践,总结薄壁钢管桩在强风化岩层的沉桩规律,得出以下结论:钢管桩进入标贯击数50击的强风化珊瑚石灰岩面时,其贯入度为21.5~28.3 mm击。桩尖位于强风化岩层时液压锤能量传递系数最大可达94.5%,薄壁钢管桩进入强风化珊瑚石灰岩持力层最深可达7.1 m,此时贯入度为1.5 mm击。基桩D1和E1高应变结果显示,薄壁钢管桩桩尖进入强风化岩层3.7 m时,端阻力值增加明显趋缓,此时比刚入岩端阻力值增加30.8%~32.8%。
Based on the piling practice of 12 mm thick steel pipe pile in a project in the Eastern Africa,we summarize the pile-driving regularity of the thin-wall steel pipe pile in the highly weathered rock area and the conclusions are as follows: when the steel pipe pile enters the highly weathered rock of 50 standard penetration blow count,the penetration is within 21. 5 ~ 28. 3 mm/blow and the maximum energy transfer coefficient reaches 94. 5% of the hydraulic pile driving hammer while the pile tip is in the highly weathered rock.The penetration depth of pile tip can reach 7. 1 m in the highly weathered rock,and the penetration is 1. 5 mm/blow correspondingly.When the pile tip of the thin-wall steel pipe pile enters 3. 7 m below the highly weathered rock layer, the end resistance increases slowly,and the resistance value of the pile increases by 30. 8% ~ 32. 8% according to the result of pile D1 and E1.
出处
《水运工程》
北大核心
2017年第12期228-231,共4页
Port & Waterway Engineering
关键词
薄壁钢管桩
强风化岩层
穿透能力
工程性状
thin-wal l s te e l p ip e p i le
h ighly w e a th e red ro c k
p e n e tra t io n p e r fo rm an c e
en g in e e r in g c h a ra c te r is t ic s