结合具体工程实例,详细介绍了钢筋混凝土框架箱涵施工过程中基坑开挖、地基处理、钢筋的制作与安装、模板安装与拆除、混凝土浇筑以及止水带施工等工艺,通过对各个工艺的精准化操作,使箱涵施工质量满足标准要求。
Combined with a concrete project case, the process of foundation pit excavation, foun-dation treatment, reinforcement fabrication and installation,template installation and removal, concretepouring and water stop construction are introduced in detail in the construction process of reinforcedconcrete frame culvert.Through the precise operation of each process, the construction quality of theculvert meets the standard requirements.