摘要
整个土木工程施工中,对工程质量的要求非常的高,目的就是要让工程建设项目落到实处,严格遵守施工技术。然后,总有一些个别施工单位不注重该项工作,没有严格落实施工技术要点,质量控制不到位,对工程施工产生不利影响。本文结合滨海新区西中环及延长线快速路工程实例,就施工技术及质量控制措施进行探讨分析,主要包括土方开挖、灌注桩施工、预应力施工、模板施工、混凝土施工等内容。
During the process of civil engineering construction, the requirement to the engineering quality is very strict, and the purpose is to fully implement the construction project based on the construction technology. Then, there are always some construction units paying no attention to strictly implement the key points of construction technology and the work of quality control, which brings bad effect to the construction work. Based on the example of the middle section of West Ring Road and its extension line in Binhai New Area, this thesis discusses the construction technology and quality control measures, mainly including earthwork excavation, filling pile construction, prestressed construction, template construction, concrete construction and so on.
作者
方宏昌
FANG Hong-chang(No. 5 Engineering Co., Ltd. of China Railway 18^th Bureau Group Tianjin 300459 Chin)
出处
《石家庄铁路职业技术学院学报》
2018年第1期62-67,共6页
Journal of Shijiazhuang Institute of Railway Technology
关键词
土木工程
模板
混凝土
质量控制
civil engineering template concrete quality control