基于BIM的长沙国际会展中心张弦梁施工精细化技术研究 被引量:6

Research on Refinement Construction Technology in Changsha International Convention and Exhibition's Beam String Structure Based on BIM
在线阅读 下载PDF
导出
摘要 针对长沙国际会展中心预应力钢结构受力形式及传力机理复杂、节点连接形式多样化、预应力张拉控制难度大等特点,将BIM技术应用到大跨度预应力钢结构施工技术中。搭建了结构施工全过程BIM模型,对节点及工装深化设计、张拉力学性能分析、施工指导与三维扫描预拼装等成套精细化施工技术做了深入研究。节点深化、有限仿真分析及可视化施工指导有效实现了对结构施工前的预控及施工中的监控,使项目达到了精细化施工要求。 Prestressed steel structure form for Changsha International Convention and Exhibition Center and the force mechanism of complex,node connection form diversification and characteristics of the prestressed tension control is difficult,the BIM technology is applied to the construction technology of large span prestressed steel structure. Building the whole structure construction BIM model,the node and the tooling design, tension performance analysis, construction guidance and complete sets of fine construction technology such as 3 D scanning pre-assembled done in-depth research. Deepening,the node finite simulation analysis and visualization construction guide effectively in structure construction before the precontrol and construction monitoring,the project meets the fine construction requirements.
作者 卫启星 段有恒 马锦姝 王泽强 司波 WEI Qixing;DUAN Youheng;MA Jinshu;WANG Zeqiang;SI Bo(Beifing Building Construction Research Institute Co. , Ltd. , Belting 100039, China)
出处 《施工技术》 CAS 2018年第7期153-156,共4页 Construction Technology
基金 住房和城乡建设部科学技术项目计划(2016-K8-046 2015-K8-031)
关键词 钢结构 建筑信息模型 张弦梁 深化设计 精细化 施工技术 steel structures building information modeling (BIM) beam string structure detaileddesign refinement construction
  • 相关文献

参考文献2

二级参考文献21

  • 1胡振中,陈祥祥,王亮,余芳强,王兴坡.基于BIM的机电设备智能管理系统[J].土木建筑工程信息技术,2013,5(1):17-21. 被引量:60
  • 2何涛,李士才,孙钦伟,唐卫清.面向设计制造一体化的管道预制管理信息系统[J].计算机辅助设计与图形学学报,2004,16(11):1613-1616. 被引量:8
  • 3赵勇.PDSOFT 3DPiping《管道预制设计系统》——在管道预制安装过程中的应用[J].石油化工建设,2007,29(1):24-27. 被引量:1
  • 4Lu N, I.iska R W. Designers and general contractors perceptions of offsite construction techniques in the United State construction industry [J]. International Journal of Construction Education and Research, 2008, 4(3): 177 - 188.
  • 5Nahangi M, Haas C T. Automated 3D compliance checking in pipe spool fabrication [J]. Advanced Engineering Informatics, 2014, 28 360-369.
  • 6Degrande V, Nervik A, Fogg D, et al. Fabrication of large-diameter, thick-walled pipe to meet special fault- crossing design requirements for San Francisco Hetch Hetchy Water System [C]// Proceedings of the Pipelines 2013 Conference. Fort Worth, USA: ASCE Press, 2013 576- 587.
  • 7Korman T M. Integrating Cycle: An Investigation Plumbing Coordination - University, 2001. Multiple Products over Their Life of Mechanical, D. Stanford, Electrical, and USA Stanford.
  • 8Tatum C B, Korman T. Coordinating building systems= Process and knowledge [J]. Journal of Architectural Engineering, 2000, 6(4) : 116 - 121.
  • 9Eastman C. General purpose building description systems [J]. Computer-Aided Design, 1976, 8(1) : 17 - 26.
  • 10Sciences N I O B. National building information modeling standard: Verionl Part1 [E/OL]. (2015-01-22), http.// www. wbdg. org/pdfs/NBIMSvl pl. pdf 2007.

共引文献30

同被引文献25

引证文献6

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部