复杂地质条件下地下厂房岩壁吊车梁开挖质量控制措施 被引量:4

Quality Control Measures of Rock Wall Crane Beam Excavation in Underground Powerhouse under Complex Geological Conditions
在线阅读 下载PDF
导出
摘要 河北丰宁抽水蓄能电站地下厂房地质条件比较复杂,节理裂隙发育明显,岩壁吊车梁开挖过程中采取了多种技术手段和管理措施,加强过程管控,结果显示显著提高了岩壁吊车梁开挖成型质量。 The underground plant geological conditions in Hebei Fengning Pumped Storage Station are complicated.Joints and fissures cut clearly.A variety of technical means and management measures have been adopted through the excavation process.The results show that the quality of rock-anchored crane beam improved significantly by strengthening process control.
作者 马雨峰 刘双华 王兰普 MA Yufeng;LIU Shuanghua;WANG Lanpu(Hebei Fengning Pumped Storage Co., Ltd. Chengde 068350, Chin)
出处 《水电与抽水蓄能》 2018年第2期27-29,13,共4页 Hydropower and Pumped Storage
关键词 岩壁吊车梁 技术手段 管理措施 过程管控 质量 rock-anchored crane beam technical means management measures process control quality
  • 相关文献

参考文献5

二级参考文献1

共引文献1

同被引文献20

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部