本文以大同煤矿集团白洞矿8110工作面为对象,进行了快速掘进工艺优化设计的研究,通过对掘进施工、临时支护和永久支护工艺的优化,进行了工序的合理配置实现了多工序平行作业的方式,快速掘进工艺提高了掘进速度,节约了生产成本。
This paper takes the 8110 working face of Baidong Mine in Datong Mine Group as the object, and carries out the research on the optimization design of the fast tunneling process. Through the optimization of the tunneling, temporary support and permanent support technology, the multi process parallel operation is realized by the rational configuration of the process. The rapid tunneling technology improves the driving speed and saves the production cost.
作者
郭宏斌
Guo Hong-bin(Hongtai Mine Engineering Construction Co., LTD., Datong Mine Group, Shanxi Datong 03700)
出处
《山东煤炭科技》
2018年第6期4-6,共3页
Shandong Coal Science and Technology
关键词
优化工艺
综掘机
快速掘进
optimization process
comprehensive tunneling machine
rapid advance