超深超重地下连续墙钢筋笼吊点布置与计算 被引量:4

ARRANGEMENT AND CALCULATION OF LIFTING POINTS FOR SUPER DEEP AND HEAVY UNDERGROUND CONTINUOUS WALL STEEL CAGE
在线阅读 下载PDF
导出
摘要 济南市轨道交通R3线裴家营站主体围护地下连续墙施工中,通过力学分析计算,确定了超深超重地下连续墙钢筋笼吊装设备型号、吊点位置、吊筋规格;结合实际工程,介绍起重机选型及吊点设计。 In the construction of the underground continuous wall of the main body of the Peijiaying Station of the R3 line of Jinan City Rail Transit, the model of the hoisting equipment of the ultra-deep and overweight underground continuous wall, the position of the lifting point and the specifications of the hanging ribs were determined through mechanical analysis and calculation; selection and lifting point design.
作者 谢申举 郭朋飞 虞星晨 XlE Shen-ju;GUO Peng-fei;YU Xing-chen(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处 《建筑技术》 2018年第11期1201-1204,共4页 Architecture Technology
关键词 地下连续墙 力学分析 钢筋笼吊装 吊点设计 underground continuous wall mechanical analysis steel cage lifting lifting point design
  • 相关文献

参考文献3

二级参考文献9

共引文献38

同被引文献20

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部