大型微污染源水生物接触氧化预处理工程的设计及运行 被引量:3

Design and Operation of Large-scale Project on Pre-treatment of Trace-polluted Source Water byBiological Contact Oxidation Process
在线阅读 下载PDF
导出
摘要 介绍了某大型源水生物接触氧化工艺治理微污染源水的工程。该工程处理规模400万m^3/d,设计水力停留时间55.4min、气水比1.0。工程于冬季启动,启动期约1个月。在随后2a连续稳定的运行中,氨氮的总去除率分别为81.7%和84.3%,生物处理池的单位填料的氨氮年均去除负荷为0.069~0.089kg/(m^3·d)。最后指出了此类大型工程设计及运行中应重点考虑的一些问题。 A large-scale pre-treatment project, with a capacity of 400×100m3/d was used to control the trace-polluted source-water by biological contact process has been designed. Its hydraulic retention time was 55.4min, air/water ratio 1.0, the start-up time was about 1 month in winter season. During the following two years operation, the total removal efficiency of ammonia-N was about 81.7% and 84.3% per year, with a high ammonia-N removal load of 0.069-0.089kg/m3d for the unit packing in the biological contact tank. Some important problems were also discussed for the large-scale project.
出处 《上海环境科学》 CAS CSSCI CSCD 北大核心 2003年第S2期175-178,201,共5页 Shanghai Environmental Sciences
关键词 大型 微污染 源水 生物接触氧化 预处理 Large-ScaleTrace-pollutedRaw-waterBiological contact oxidationPretreatment engineering
  • 相关文献

参考文献7

二级参考文献32

共引文献51

同被引文献34

引证文献3

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部