盾构机钢板+导轨接收空推平移技术探讨 被引量:6

Technical discussion on shield motion methods of receiving, tare pushing and translation used between steel plate–guide rail
在线阅读 下载PDF
导出
摘要 地铁隧道及车站施工受场地内大型吊装设备站立条件和上方净空障碍的影响,盾构在接收或过站过程中,盾构机通常不能够在接收端井口吊出,需要采取空推和平移的方式移动至合适的位置拆解吊出。文章以长春地铁2号线BT08标的接收案例为背景,阐述了钢板-导轨接收、平移、空推技术。实践表明,该技术与基座和导台接收相比,具有施工简便、节省成本、材料设备需求低的优点;与单纯的钢板法相比,具有安全系数高、可靠性好、空推速度快的优点。 Metro tunneling and station construction site are affected by the large hoisting equipment stand conditions and clearance above obstacles.At the receiving and passing station,shield is usually failed to be hoisted out at the receiving end of the shaft portal,so it needs to use the moving method of tare pushing and translating to the proper position,in order to dismantle and hoist it out.Taking Changchun metro line2BT08receiving performance as the case study,this paper describes the shield motion technology of reception,translation,tare pushing from steel plate to guild rail.The actual practice shows that the technology has the advantages of simple construction,cost saving,low demand on material and equipment compared to the foundation base and guide platform receiving method,while it has the advantages of high safety,good reliability,fast speed of tare pushing compared with the simple steel plate method.
作者 赵志龙 朱英伟 周建伟 杨芳盛 徐桩 Zhao Zhilong;Zhu Yingwei;Zhou Jianwei
出处 《现代城市轨道交通》 2018年第3期37-40,共4页 Modern Urban Transit
关键词 地铁 盾构施工 盾构接收 平移空推 技术探讨 metro shield construction steel plate receiving motion of translation and tare pushing technical discussion
  • 相关文献

参考文献5

二级参考文献23

共引文献78

同被引文献52

引证文献6

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部