城市水体综合治理项目施工期风险分析 被引量:1

Analysis of risks during construction period for comprehensive urban water body control project
在线阅读 下载PDF
导出
摘要 以深圳茅洲河流域(宝安片区)水环境综合治理项目为例,从项目施工、施工布置和施工环境3个方面,分析了城市水体综合治理工程施工期存在的主要风险,并有针对性地提出了8条对应措施.分析结果表明:项目施工存在中毒窒息、透水等10项主要风险;施工布置存在火灾、爆炸等7项主要风险;施工环境存在社会突发事件、台风等7项主要风险. Taking for example the comprehensive water environment control project of Maozhou river basin(Bao’an district) in Shenzhen,the main risks during construction period for comprehensive urban water body control project are analyzed in terms of three aspects including project construction,construction layout and construction environment,and eight corresponding measures are put forward. The analysis results show that,there are ten major risks existing in the project construction,such as poisoning choke and percolation etc. There are seven major risks existing in the construction layout,such as fire and explosion etc. and there are nine major risks existing in construction environment,such as social emergencies and typhoon etc.
作者 黄仕鑫 高长仁 孟路园 Huang Shixin;Gao Changren;Meng Luyuan(Hubei Anyuan Safety Environmental Protection Technology Co.,Ltd,Wuhan 430074)
出处 《工程建设》 2019年第9期61-64,共4页 Engineering Construction
关键词 城市水体 综合治理 风险分析 对策措施 urban water body comprehensive control risk analysis countermeasures
  • 相关文献

参考文献1

二级参考文献4

共引文献8

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部