660MW锅炉气力输灰系统的优化改造 被引量:4

Optimization and Transformation of Pneumatic Ash Conveying System in 660 MW Boiler
在线阅读 下载PDF
导出
摘要 分析某电厂660 MW机组在调试期间气力输灰系统的堵灰现象,指出是由省煤器堵灰、除尘器输灰不畅和灰斗料位高引起的。采取调整输灰逻辑、进料时间、输灰间隔和调整气化风温度等手段,解决省煤器和除尘器输灰系统堵灰问题,为同类设备运行提供了借鉴。 The phenomenon of ash blockage in the pneumatic ash conveying system of a 660 MW power plant during commissioning is analyzed,which is caused by ash blockage of economizer,poor ash transport of precipitator and high level of dust hopper.Measures are taken to adjust the logic of ash transport,feeding time,ash transport interval and temperature of gasification air,which provides reference for similar equipment operation.
作者 毛其东 崔方辰 刘永华 MAO Qidong;CUI Fangchen;LIU Yonghua(Shengli Guodian(Dongying)Thermoelectric Power Co.,Ltd.,Dongying 257100,Shandong Province,China)
出处 《电力安全技术》 2019年第9期53-55,共3页 Electric Safety Technology
关键词 布袋除尘器 气力输灰系统 堵灰 bag filter pneumatic ash conveying system ash blockage
  • 相关文献

参考文献2

共引文献1

同被引文献12

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部