本文针对隧道二次衬砌拱顶脱空问题,在分析成因的基础上,提出了隧道防水板挂设工艺及隧道拱顶混凝土真空辅助灌注施工方法,并详细介绍了技术原理和施工步骤,以期对类似工程提供参考和借鉴。
In this paper,based on the analysis of the cause of the hollowing of the tunnel's secondary lining vault,this paper puts forward the installation technology of the tunnel waterproof board and the construction method of the vacuum-assisted pouring of the vault concrete,and introduces the technical principle and construction steps in detail to provide reference for similar projects.
作者
刘新福
LIU Xin-fu(China Railway 17th Bureau Group Co.,Ltd.,Taiyuan 030006,China)
出处
《价值工程》
2020年第16期129-130,共2页
Value Engineering
关键词
隧道二衬
拱顶
真空
灌注
tunnel second lining
vault
vacuum
pouring