摘要 根据电压互感器工作原理,分析了10 kV母线PT爆炸故障的原因,并给出了相应的改进措施。除在电压互感器一次侧和二次侧加装消谐装置外,监测零序电压并进行谐波治理,可减小停电范围,保证生产的顺利进行。 This paper analyzes the reason of the 10 kV busbar PT explosion fault from the principle of voltage transformer operation,and the corresponding improvement measures are given.In addition to the harmonic elimination device installed on the primary side and the secondary side of the voltage transformer,the zero sequence voltage is monitored.At the same time,harmonic control is carried out to reduce the power outage range and ensure smooth production.
作者 张兵 马发岐 孙青 ZHANG Bing;MA Faqi;SUN Qing(No.4 Engineering Dept. ,SIPPR Engineering Group Co. ,Ltd, Zhengzhou 450007, China;Safety Management Department,China Tobacco Sha′anxi Industrial Co. , Ltd,Xi′an 710065, China;Baoji Cigarette Factory,China Tobacco Sha′anxi Industrial Co. , Ltd, Baoji 721000, China)
出处 《成组技术与生产现代化》 2020年第1期36-38,共3页 Group Technology & Production Modernization
关键词 10 kV中性点不接地 电压互感器 运行故障 改进措施 10 kV neutral point is not grounded voltage transformer operation fault improvement measures
  • 相关文献

参考文献7

二级参考文献9

共引文献2

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部