期刊文献+

官地矿静态切顶卸压的参数设计研究 被引量:1

Study on Parameter Design of Static Roof-cutting Pressure Relief in Guandi Mine
在线阅读 下载PDF
导出
摘要 针对沿空留巷处于采空区附近区域的采动影响较大,巷道变形较大等问题。本文利用静态破碎剂遇水膨胀的原理,对直接顶进行切顶卸压。通过研究钻孔的破碎机理和裂缝的扩展情况,并结合官地矿12607工作面现场实际情况,给出了钻孔设计的最合理间距为0.9 m,对巷道的稳定性作出了一定的贡献,为研究沿空留巷时巷道变形较大,顶板下沉量大等问题作出了一定的贡献。 Aiming at the problems of large mining influence and large deformation of goaf retaining roadway near goal, the principle of static crushing agent expanding in the presence of water is used to cut the top of the direct roof and relieve pressure in this paper. By studying the fragmentation mechanism of boreholes and the propagation of cracks, combining with 12607 working face of Guandi mine, the optimum distance of boreholes design is 0.9 m,which contributes to the stability of roadways. It also contributes to the study of large deformation of roadways and large roof subsidence when retaining roadways along goal.
作者 杜利伟 Du Liwei(Guandi Mine,Shanxi Coking Coal Group Co.,Ltd.,Taiyuan Shanxi 030022)
出处 《山西冶金》 CAS 2020年第4期76-78,共3页 Shanxi Metallurgy
关键词 沿空留巷 静态卸压 裂缝扩展 钻孔步距 gob-side entry retaining static pressure relief crack propagation drilling step
  • 相关文献

参考文献5

二级参考文献61

共引文献56

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部