长周期煤化工建设项目遭遇的难题实例及应对措施 被引量:2

Problem case and countermeasure suffered from long-period coal chemical construction project
在线阅读 下载PDF
导出
摘要 内蒙古大唐鼎旺化工有限公司合成氨、硝酸和硝铵项目用时8 a完成了项目的建设。因国家法律法规、国家(行业)标准升级和地方性政策调整,致使项目在建设过程中遇到消防、安全、环保等行业要求的合规性问题,企业在采取了一系列有效应对措施后,最终通过了试生产审查。从消防、安全、环保3个方面进行了概括性的总结。 The synthetic ammonia, nitric acid and ammonium nitrate project of Inner Mongolia Datang Dingwang Chemical Co.,Ltd. Completed the project’s construction. Because of national laws and regulations,national( industry) standard upgrades and local policy adjustments,as a result,the project encountered in the construction process of fire, safety,environmental protection and other industry requirements of compliance problems, after the enterprise adopts a series of effective measurement, it finally passes trial production review. The general summary is made from three aspects,such as fire protection,safety and environmental protection.
作者 孟盘继 王连柱 MENG Pan-ji(Inner Mongolia Datang Dingwang Chemical Co.,Ltd.,Inner Mongolia Sunit Left Banner 011300,China)
出处 《煤炭加工与综合利用》 CAS 2020年第10期50-56,I0001,共7页 Coal Processing & Comprehensive Utilization
关键词 合成氨 硝酸 硝铵 环评 设计 专项验收 Synthetic ammonia Nitric acid Ammonium Nitrate Environmental assessment design Special acceptance
  • 相关文献

参考文献1

二级参考文献9

共引文献1

同被引文献12

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部