摘要 山丘区河道由于河道狭窄,水文条件较为复杂,该区域电力工程应满足设计防洪要求。本文以哈尔滨蜚克图河流域某电力工程为例,介绍蜚克图河洪水来源及特征,分析50a一遇洪水位的计算过程,研究山丘区河道洪水对电力工程的影响;并采用历史洪水调查和曼宁公式两种方法分别进行计算,相互验证。结果表明,二者结果基本一致,结论可靠。 Because the river in the hilly area is narrow,and the hydrological conditions are more complicated,the power project should meet the requirements of design flood control. In order to study the influence of river flood on power project in hilly area,a power project of Feiketu River in Harbin is taken as an example,the source and characteristics of flood of Feiketu River in Harbin are introduced;the calculation process of flood level of 50 year return period is analyzed,and the influence of river flood on power project in hilly area is studied. Then,such two methods as historical flood investigation and Manning formula are used to calculate and verify each other. The results show that the two results are basically consistent and the conclusion is reliable.
作者 马惠群 王勇 Ma Huiqun;Wang Yong(Shandong Electric Power Bngineering Consulting Institute Co.,Ltd.,Jinan 250013,Shandong)
出处 《工程建设》 2020年第11期49-51,共3页 Engineering Construction
关键词 山丘区河道 设计洪水位 电力工程 rivers in hilly area design flood stage power project
  • 相关文献

参考文献7

二级参考文献18

  • 1徐长江.中英美三国设计洪水方法比较研究[J].人民长江,2005,36(1):24-26. 被引量:16
  • 2[2]城镇防洪[M].1983.
  • 3[4]DL/T5084-1998,电力工程水文技术规定[S].
  • 4邹文安,偶子春,胡长权.220kV中京至宁城送电线新建工程施工图设计阶段工程水文勘测报告[R].长春:东北电力设计院,2008.
  • 5林一山.曼宁公式与水利科学.调查研究通讯,2006,.
  • 6DL/T5076-1997,220kV架空送电线路水文勘测技术规范[s].
  • 7SL196-97.水文调查规范[S].[S].,..
  • 8DL/T5084-1998.电力工程水文技术规程[S].
  • 9电力工程水文勘测计算手册.1981年.北京.
  • 10杨德应,苏念良,卢乃霞.清涧河上游“02·7”暴雨调查雨量可靠性分析[J].人民黄河,2007,29(12):21-22. 被引量:1

共引文献30

同被引文献10

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部