期刊文献+

查干木伦河“7·25”特大暴雨洪水影响分析 被引量:2

Impact analysis of “7·25” torrential rain and flood in Chagan Mulun River
在线阅读 下载PDF
导出
摘要 为分析查干木伦河2011年"7·25"特大暴雨洪水对德日苏宝冷水库防洪产生的影响,本文采用1957—2015年洪水系列,并将"7·25"洪水作为历史特大洪水考虑,对坝址设计洪水成果进行了全面复核分析,重新提出了较为合理的最新设计洪水成果,复核结果表明德日苏宝冷水库设计洪水发生了大幅度变化。 In order to analyze the influence of Chagan Mulun River "7 ·25"torrential rain flood in 2011 on the flood control of Deri Subaoleng Reservoir,this paper adopts the flood series from 1957 to 2015,and takes the "7. 25"flood as the historical catastrophic flood,and makes a comprehensive review and analysis of the design flood results of the dam site.The reasonable latest design flood results are put forward again. The recheck results show that the design flood of Deri Subaolong Reservoir has changed greatly.
作者 张福然 刘志峰 ZHANG Furan;LIU Zhifeng(Liaoning Water Conservancy And Hydropower Survey Design&Research Institute Co.,Ltd,Shenyang 110006,China;Risu Baoleng Reservoir Management Bureau,Chifeng 025150,China)
出处 《水资源开发与管理》 2021年第2期68-72,共5页 Water Resources Development and Management
关键词 德日苏宝冷水库 “7·25”特大暴雨 设计洪水 复核 Derisubao Cold Reservoir "7·25"torrential rain design flood review
  • 相关文献

参考文献1

二级参考文献5

共引文献9

同被引文献15

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部