摘要
沙颍河颍上一线船闸是沙颍河下游的第一个复航工程,但在实际施工过程中,船闸边墙由于施工缝处理不规范、温度变化等因素出现裂缝。基于此,文中对船闸边墙砼裂缝成因进行分析,重点研究相应的处理工艺,以期提高工程质量。
Yingshang First Line shiplock of Shaying River is the first resumption project in the lower reaches of Shaying River.However,in the actual construction process,cracks appear on the side wall of shiplock due to nonstandard treatment of construction joints,temperature changes and other factors.Based on this,this paper analyzes the causes of concrete cracks on the side wall of ship lock and focuses on the corresponding treatment technology,in order to improve the quality of project.
作者
胡应苗
柳金顶
HU Yingmiao;LIU Jinding(Anhui Port&Shipping Construction Investment Group Co.,Ltd.,Hefei,Anhui,230061,China;Fuyang Local Maritime(Port&Shipping)Management Service Center,Fuyang,Anhui,236000,China)
关键词
船闸边墙
砼裂缝
灌浆工艺
shiplock side wall
concrete crack
grouting technology