期刊文献+

淮河入海水道二期工程征占地优化路径探讨 被引量:3

Discussion on optimization path of land expropriation and occupationfor the second-phase project of Huaihe River Sea-entering Channel
在线阅读 下载PDF
导出
摘要 淮河入海水道二期工程征占地问题是工程决策的关键问题,也是工程建设必须解决的问题。运用工程设计原理和土地资源开发利用理论,以系统论和协同论的思想,从工程优化设计、弃土综合利用等方面进行研究,提出了工程征占地优化思路:少征占,多利用,并提出具体的优化路径。 The issue of land expropriation and occupation for the second-phase project of Huaihe River Sea-entering Channel is a key issue in project decision-making,and it's also a problem that must be resolved in project construction.Based on the principle of engineering design and theory of land resources development and utilization,and with the idea of system theory and coordination theory,the optimization idea of project land expropriation and occupation was proposed from aspects of engineering optimization design and comprehensive utilization of discarded soil:less expropriation and occupation and utilization,and specific optimization paths were proposed.
作者 黄莹 叶新霞 朱祥 聂振 李晖 邵真真 HUANG Ying;YE Xinxia;ZHU Xiang;NIE Zhen;LI Hui;SHAO Zhenzhen(Jiangsu Water Conservancy Survey and Design Institute Co.,Ltd.,Yangzhou 225127,China;Water Conservancy Bureau of Baoying County,Yangzhou 225800,china)
出处 《江苏水利》 2021年第7期1-4,9,共5页 Jiangsu Water Resources
基金 江苏省水利科技项目(2018011)。
关键词 入海水道 征占地 优化路径 水利工程 弃土 sea-entering channel land expropriation and occupation optimization path water conservancy project discarded soil
  • 相关文献

参考文献6

二级参考文献8

共引文献31

同被引文献17

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部