随着城市桥梁建设传统工艺的变革,桥梁预制结构类型的增加,对桥梁预制构件场的规划建设提出了更高的要求。以湘府路快速化改造工程的预制构件场的建设为例,结合项目的实际情况,因地制宜地对预制构件场进行规划布局,分别从立柱、盖梁、钢板组合梁生产线的布置要点、设备选型、功能使用、绿色施工等方面进行深入介绍。
With change of the traditional technology of urban bridge construction and increase of the type of bridge prefabricated structure,higher requirements are put forward for planning and construction of bridge prefabricated component.With the construction of prefabricated component field of Xiangfu Road rapid transformation project as an example’combined with the actual situation of the project,according to the local conditions of the prefabricated component field planning layout,layout points,equipment selection,function use,green construction and other aspects of column,cap beam-steel plate composite beam production line are introduced deeply.