摘要
为进一步保障地下管道施工质量,为城市居民提供更加可靠的服务,我国对综合管廊施工技术的研究不断深入。基于此,以实际工程项目为例,围绕装配式大截面节段综合管廊施工关键技术展开详细的分析和探讨,以期能为相关技术人员和研究者提供参考。
In order to further guarantee quality of underground pipeline construction and provide more reliable services for urban residents,China has continuously studied construction technology of the integrated pipeline gallery.Based on this,the article takes the actual engineering project as an example to carry out detailed analysis and discussion around the key technology of the prefabricated large-section integrated pipe gallery construction,hoping to provide references for related technicians and researchers.
作者
郭廷科
马晓青
全桂杰
Guo Ting-ke;Ma Xiao-qing;Quan Gui-jie
出处
《建筑技术开发》
2021年第21期47-49,共3页
Building Technology Development
关键词
装配式
综合管廊
基坑
prefabricated
integrated pipe gallery
foundation pit